Bathroom Remodeling in Vinings, GA
Most bath work in Vinings is the primary suite: an 80s or 90s room with a platform soaking tub, separate shower and double vanities that owners want to turn into a larger walk-in or curbless shower with heated floors and stone or large-format porcelain. In the village cottages the baths are smaller, framed into plaster with older supply lines. For second-floor suites, we check the joists and floor stiffness early, since they decide what tile and shower entry are possible.
Cobb County · Vinings, GA
Bathroom Remodeling for Vinings homes
The stock sorts into three bands, and every one of them runs to remodeling rather than repainting. Around the Old Vinings village core sit genuinely old houses — white clapboard and weatherboard cottages and craftsman bungalows from the late 1800s into the early 1900s, with wood sash, deep trim and plaster that need real carpentry and careful prep before any finish coat. The bulk is established single-family: large 1960s homes on wooded lots and 1970s-through-90s traditional houses and contemporary manors in brick and cedar, on hilly ground where daylight and walkout basements make basement finishing a standard job and decks step down the slope in multiple levels rather than sitting flat off the back. On the river side and up on Vinings Mountain the newer custom and luxury homes raise the spec again — finish carpentry, custom cabinetry, and cedar or fiber-cement siding and outdoor-living work, with moisture a real factor on the wooded riverfront lots.
Areas we work in Vinings
- Vinings Village
- Paces Ferry Heights
- Courtyards of Vinings
- Olde Vinings Mill
- One Vinings Mountain
- Highlands at Vinings
Near Vinings Jubilee, Pace House, Mount Wilkinson and across the rest of Vinings.
Recent bathroom remodeling work
Bathroom Remodeling on Vinings houses
Bath remodels in Vinings are mostly primary-suite work in the established houses. The 1980s and 90s homes in the traditional and contemporary neighborhoods were built with large primary baths, a soaking tub on a platform, a separate shower, and double vanities, finished in the tile and brass of that era. Owners now want a larger walk-in shower, often curbless with frameless glass, heated floors and stone or large-format porcelain. In the village core the older cottages have small baths framed into plaster walls with old supply lines. Because many of these baths sit on the second floor of tall houses on sloping lots, what is under the floor matters as much as what goes on it.
What usually gets missed
The curbless shower is where these get underestimated. Getting a flush entry means recessing the shower floor between the joists or building up the whole bathroom floor, and in a second-floor bath that touches framing and the ceiling below. Large-format stone also needs a stiff, flat floor or it cracks, so joist span and deflection get checked before tile is chosen. And on a platform tub, the deck often hides old water damage around the faucet, so it comes out completely rather than getting reused.
On a Vinings job we check
- Plan how a curbless floor recesses into the joists before design
- Check floor stiffness before large-format stone tile
- Open platform tub decks fully to find hidden water damage
What the job actually involves
Water is the thing that wrecks bathrooms. A good remodel is mostly waterproofing, ventilation and slope, with the visible tile and fixtures coming after.
We use cement board or a waterproof backer, a sealed membrane in showers, and mildew-resistant caulk and paint, because the finish layers only last if the water is kept out of the walls and floor.
How we run a bathroom remodeling job in Vinings
- 1
Demo and inspect for water damage
Old tile, tub, vanity and flooring come out down to the framing. We check the subfloor and wall studs for soft spots and rot, which are common around old tubs and toilets in humid climates.
- 2
Repair framing and rough-in plumbing and electrical
Rotted wood is replaced, plumbing is moved or updated, and wiring and fan circuits are brought up to date. Permitted work gets inspected at this stage.
- 3
Waterproof the wet areas
Cement board or a foam backer goes up in showers and tub surrounds, and seams are sealed with a waterproofing membrane. Shower pans are sloped toward the drain and flood-tested before tile when the setup calls for it.
- 4
Tile and flooring
Tile is set over a flat surface with the proper thinset and given time to cure before grouting. Rushing grout over wet thinset leads to cracks and loose tile.
- 5
Vanity, fixtures, ventilation and paint
The vanity, toilet, faucets and lighting are installed. A working exhaust fan vented outside matters in Georgia humidity, otherwise mildew returns. Paint uses a moisture-resistant finish.
- 6
Seal, clean and walk through
Grout is sealed where needed and silicone goes at corners and tub lines. We clean up and go through the room with you.
What moves the price
We will not quote Vinings blind over the phone — these are the things we look at on site that decide the number.
- Size of the bathroom and whether the layout stays the same or fixtures move.
- Shower or tub choice: standard tub, tiled shower, curbless or walk-in.
- Tile type, pattern and amount. Detailed patterns and large-format tile need more labor.
- Hidden damage, mostly rot in the subfloor and walls.
- Vanity, countertop and fixture quality.
- Plumbing, electrical and ventilation upgrades, including permits.
From a bathroom remodeling customer
“We’ve been working with WS Painting and Remodeling after two leaks in our home, and they’ve been fantastic. … The quality of their work has been outstanding and made a stressful situation much easier.”
Leak repairs
Want a real number for your Vinings bathroom remodeling job?
The only way to price it honestly is to see it. We come out, walk the job and put it in writing — free, and with no obligation to book.
Call and we answer 24/7. Forms sent during the day get a call back the same day.
Bathroom Remodeling in Vinings — questions we get asked
- How long will my bathroom be unusable?
- A typical hall bath often takes a couple of weeks, sometimes longer for a full master bath or custom tile. Drying and curing time is part of that.
- Do I need a second bathroom while you work?
- It helps a lot. If this is your only bathroom, tell us and we will plan to shorten the time it is out, or discuss options.
- Do you handle the plumbing?
- We coordinate plumbing and electrical work and any required permits and inspections.
- Can you convert a tub to a shower?
- Yes, in most layouts. It involves changing the drain, framing and waterproofing, so it costs more than swapping a fixture.
- What if you find rot?
- We show you, explain the repair, and price it before continuing. It is common in older bathrooms and should be fixed rather than covered.
Planning bathroom remodeling? Start here
- What happens during a bathroom remodel, step by step Why a bathroom is built from the water out, how curing and glass set the schedule, and how long the room is out of use.
- Is your bathroom worth remodeling, or just worth refreshing? How to tell a failing bathroom from a dated one, what is genuinely worn out in a 90s bath, and what is worth keeping.
- What a remodeling estimate should include, line by line A real estimate reads as a scope of work, not a single number. Here is what it should itemize, where a cheap one hides the gaps, and how to budget for what is behind the walls.
More in Vinings
Cobb County housing, neighborhoods and what we do there.
Painting & remodeling in Vinings →Other work in Vinings
- Interior Painting in Vinings
- Exterior Painting in Vinings
- Cabinet Painting & Refinishing in Vinings
- Deck & Fence Staining in Vinings
- Commercial Painting in Vinings
- Drywall Repair & Patching in Vinings
- Kitchen Remodeling in Vinings
- Basement Finishing in Vinings
- Deck & Porch Building in Vinings
- Siding Replacement in Vinings
- Flooring Installation in Vinings
Prefer to talk it through? Dan picks up.
(470) 924-9277