Skip to content
WS Painting & Remodeling
Call

Kitchen Remodeling in Vinings, GA

Homeowners in Vinings tend to want more from a kitchen than new doors and counters: one open room in place of a separate kitchen, breakfast room and dining room, often with custom cabinetry and a pro-style range. That ambition runs into real questions about walls, venting and floor framing in houses built decades ago. Many of these homes sit over a basement, which can help with new runs. We work through those constraints before a layout is promised.

Cobb County · Vinings, GA

Get a free estimate

Step 1 of 3

What do you need? * Pick all that apply

Free and no obligation. We never sell or share your details.

Kitchen Remodeling for Vinings homes

The stock sorts into three bands, and every one of them runs to remodeling rather than repainting. Around the Old Vinings village core sit genuinely old houses — white clapboard and weatherboard cottages and craftsman bungalows from the late 1800s into the early 1900s, with wood sash, deep trim and plaster that need real carpentry and careful prep before any finish coat. The bulk is established single-family: large 1960s homes on wooded lots and 1970s-through-90s traditional houses and contemporary manors in brick and cedar, on hilly ground where daylight and walkout basements make basement finishing a standard job and decks step down the slope in multiple levels rather than sitting flat off the back. On the river side and up on Vinings Mountain the newer custom and luxury homes raise the spec again — finish carpentry, custom cabinetry, and cedar or fiber-cement siding and outdoor-living work, with moisture a real factor on the wooded riverfront lots.

Areas we work in Vinings

  • Vinings Village
  • Paces Ferry Heights
  • Courtyards of Vinings
  • Olde Vinings Mill
  • One Vinings Mountain
  • Highlands at Vinings

Near Vinings Jubilee, Pace House, Mount Wilkinson and across the rest of Vinings.

Recent kitchen remodeling work

Photos from recent WS Painting & Remodeling jobs across the metro.

Kitchen Remodeling on Vinings houses

Kitchen remodeling in Vinings runs to a higher spec than most of the metro, and the house sets the constraints. The 1970s-through-90s traditional homes usually have a separate kitchen, breakfast room and formal dining room, and owners want them joined into one open space with an island, which means taking down walls that may carry the floor or roof above. The 1980s contemporaries have vaulted ceilings and angled walls that make cabinet layout and venting harder. Because so many of these homes sit over a basement on a sloped lot, new plumbing and electrical can often run from below. On Vinings Mountain and the river side, custom cabinetry, stone tops and pro-style ranges are the norm.

What usually gets missed

The surprise in these kitchens is usually the venting and the weight. A pro-style range needs a real exhaust run to the outside, and on a two-story traditional or a vaulted contemporary that path is not always simple, so it is planned before the cabinets are drawn. Heavy stone tops and a large island also load a floor framed decades ago. If the basement below is finished, getting to plumbing and joists means opening a ceiling there. Those three get looked at before a layout is promised.

On a Vinings job we check

  • Route the range hood exhaust to the outside before final layout
  • Check floor framing under a heavy stone island
  • Plan access through the basement ceiling for new plumbing runs

5.0 from 44 Google reviews. A supervisor runs every job on site.

Get a free estimate

Step 1 of 3

What do you need? * Pick all that apply

Free and no obligation. We never sell or share your details.

(470) 924-9277

What the job actually involves

A kitchen remodel is several trades working in sequence in a small room. The order matters: demo, rough plumbing and electrical, inspections, cabinets, counters, backsplash, then finish work.

We use materials chosen for kitchens: moisture-resistant backing behind tile and sinks, solid cabinet boxes, and countertop materials that handle heat and stains, because kitchens take more abuse than any other room.

How we run a kitchen remodeling job in Vinings

  1. 1

    Plan the layout and order materials

    Before demo we settle the layout, appliance sizes, cabinet orders and counter materials. Cabinets and special-order items can take weeks to arrive, so ordering early keeps the kitchen from sitting half-built.

  2. 2

    Demolition and protection

    Old cabinets, counters and flooring come out. Dust walls go up and floors elsewhere get covered. We check what is behind the walls and for water damage, old wiring or surprises.

  3. 3

    Rough-in plumbing, electrical and structure

    Any moved sinks, new circuits, venting or wall changes are done now, before drywall closes things back up. Permit work and required inspections happen at this stage where the work calls for them.

  4. 4

    Drywall, paint and flooring

    Walls are patched and finished, and floors go in. Painting happens before cabinets where it makes sense, which gives a cleaner result.

  5. 5

    Install cabinets, then template countertops

    Cabinets are set level and tied together. Counters are templated after cabinets are in, then fabricated, which commonly takes a week or more for stone, then installed.

  6. 6

    Backsplash, fixtures and finish

    Tile, plumbing fixtures, lighting, hardware and appliances go in last, followed by caulking, touch-up paint and a thorough cleanup. We walk through with you and work through a punch list.

What moves the price

We will not quote Vinings blind over the phone — these are the things we look at on site that decide the number.

  • Scope: a cosmetic refresh versus moving walls, plumbing or the whole layout.
  • Cabinets: stock, semi-custom or custom, and how many.
  • Countertop material and square footage. Quartz, granite and laminate span a wide range.
  • Appliances and whether electrical or gas lines need to move.
  • Flooring, tile and lighting choices.
  • Hidden conditions such as rot, outdated wiring or uneven floors discovered during demo.
See typical kitchen remodeling price ranges →

From a kitchen remodeling customer

“This time it was a deck project as well as a full front door replacement. … Most importantly if there is something that is not to your liking, he will make it right. Not the norm in the contractor world.”
Grant Segal
Deck and front door replacement
All 44 reviews →

Want a real number for your Vinings kitchen remodeling job?

The only way to price it honestly is to see it. We come out, walk the job and put it in writing — free, and with no obligation to book.

Call and we answer 24/7. Forms sent during the day get a call back the same day.

Kitchen Remodeling in Vinings — questions we get asked

How long does a kitchen remodel take?
Often several weeks to a couple of months, depending on scope and how long materials take to arrive. Lead time on cabinets and countertops is usually what stretches the schedule.
Can I live in the house during it?
Yes, though you will be without a normal kitchen for a good stretch. Many people set up a temporary spot with a microwave and a small fridge in another room. We keep dust contained and the rest of the house usable.
Do I need permits?
Many kitchen jobs involving electrical, plumbing or structural changes do. We tell you what applies in your county or city. Cosmetic updates may not need one.
What surprises show up most?
Water damage under old sinks and dishwashers, outdated wiring, and floors that are not level. We point these out when we find them, along with options.
Can you keep my existing cabinets?
Sometimes. If the boxes are sound and the layout works, refinishing or painting them can save money.

Prefer to talk it through? Dan picks up.

(470) 924-9277

Like our work? Get a free written estimate for yours.

Call (470) 924-9277 Free Estimate